Searching over 5,500,000 cases.


searching
Buy This Entire Record For $7.95

Download the entire decision to receive the complete text, official citation,
docket number, dissents and concurrences, and footnotes for this case.

Learn more about what you receive with purchase of this case.

NEW CHARLESTON POWER I v. FEDERAL ENERGY REGULATORY COMMISSION </h1> <p class="docCourt"> </p> <p> June 16, 1995 </p> <p class="case-parties"> <b>NEW CHARLESTON POWER I, L.P., PETITIONER<br><br>v.<br><br>FEDERAL ENERGY REGULATORY COMMISSION, RESPONDENT</b><br><br> </p> <div class="caseCopy"> <div class="facLeaderBoard"> <script type="text/javascript"><!-- google_ad_client = "ca-pub-1233285632737842"; /* FACLeaderBoard */ google_ad_slot = "8524463142"; google_ad_width = 728; google_ad_height = 90; //--> </script> <script type="text/javascript" src="http://pagead2.googlesyndication.com/pagead/show_ads.js"> </script> </div class="facLeaderBoard"> <div class="numbered-paragraph"><p><br> Before: Silberman, Henderson, and Randolph, Circuit Judges.</p></div> <div class="numbered-paragraph"><p> Randolph, Circuit Judge</p></div> <div class="numbered-paragraph"><p> FOR PUBLICATION</p></div> <div class="numbered-paragraph"><p> FOR THE DISTRICT OF COLUMBIA CIRCUIT</p></div> <div class="numbered-paragraph"><p> Argued April 17, 1995</p></div> <div class="numbered-paragraph"><p> Public Utilities Commission of the State of California, and Southern California Edison Company, Intervenors</p></div> <div class="numbered-paragraph"><p> Petition for Review of Orders of the Federal Energy Regulatory Commission</p></div> <div class="numbered-paragraph"><p> Opinion for the court filed by Circuit Judge Randolph.</p></div> <div class="numbered-paragraph"><p> Should rain-soaked cow manure be treated like a volcanic eruption in the Phillipines or, instead, like a golf ball that knocks out a high-voltage transformer? Odd as it may seem, that is one of the contested points in this strange case.</p></div> <div class="facAdFloatLeft"> <script type="text/javascript"><!-- google_ad_client = "ca-pub-1233285632737842"; /* FACContentLeftSkyscraperWide */ google_ad_slot = "1266897617"; google_ad_width = 160; google_ad_height = 600; //--> </script> <script type="text/javascript" src="http://pagead2.googlesyndication.com/pagead/show_ads.js"></script> </div class="facLeaderBoard"> <div class="numbered-paragraph"><p> The case arises under legislation described as "the solution that won't die for the problem that did." Jeff Bailey, "Purpa' Power, Wall St. J., May 17, 1995, at A1. Whether that accurately portrays Section(s) 210(a) of the Public Utilities Regulatory Policies Act of 1978 (PURPA), Pub. L. No. 95-617, 92 Stat. 3117 (codified at 16 U.S.C. Section(s) 824a-3), is not our concern. The "problem," as the 1978 Congress foresaw it, was the high price of oil climbing ever higher and the country growing ever more dependent on foreign oil suppliers. A "solution," Congress thought, was to encourage alternative sources of electricity from "small power production facilities" in the hope of diminishing the demand for fossil fuels. FERC v. Mississippi, <a>456 U.S. 742</a>, 750 (1982). In PURPA terminology, "small power production facilities" are those with a capacity of less than 80 megawatts, producing electricity by using, as their "primary energy source, ... biomass, waste, renewable resources, geothermal resources, or any combination thereof," 16 U.S.C. 796(17)(A)(i). Congress directed the Federal Energy Regulatory Commission to set down rules requiring electric utilities to purchase electricity from qualifying facilities-"QFs," 16 U.S.C. Section(s) 824a-3(a). With the QFs receiving this and other favorable treatment, PURPA spawned a new industry. Small power plants using windmills, or methane from landfills, or solar energy sprang up around the country.</p></div> <div class="numbered-paragraph"><p> An unusual, indeed unique, method of producing electricity from other than fossil fuels is at the center of the present dispute. In 1988, at a cost of $49 million, the 15 megawatt-capacity Mesquite Lake Facility in El Centro, California, came on line as a QF, designed to burn cattle manure to generate electricity for sale to Southern California Edison Company. Despite a steady supply of fuel from the farms and feedlots in the surrounding Imperial Valley (when running, the Facility burned 40 tons of manure an hour), the Facility ran into immediate operational difficulties. Furnaces failed, boiler tubes corroded, refractory ceiling bricks collapsed, equipment fouled. Incomplete combustion caused the Facility to exceed the level of carbon monoxide emissions allowed under its air permit. During 1989 and 1990, the Facility shut down for months at a time while repairs were made. Another partial shutdown occurred in 1992.</p></div> <div class="numbered-paragraph"><p> In February 1993, New Charleston Power I, L.P., the petitioner here, purchased the Mesquite Lake Facility and began repairing and redesigning it. By April, the refurbished Facility was ready for a test run. Once again the machinery sputtered as the old problem of boiler fouling reoccurred and new problems in handling ash arose. Petitioner blamed some of this on record-setting winter rains in the Imperial Valley. The rains began soaking the cow manure in December. As the rains continued and the cattle milled about in wet pens, the manure became "contaminated" with mud. It was this wet, mud-laden manure, petitioner says, that fouled the boilers and other equipment and caused, or at least exacerbated, the damage.</p></div> <div class="numbered-paragraph"><p> Although the Mesquite Lake Facility could not safely burn cow manure until repairs were made, it could still produce electricity from natural gas. And so in October 1993, petitioner requested the Commission to waive, for calendar years 1993 and 1994, its regulation limiting QFs to using fossil fuel for no more than 25 percent of their total annual energy supply. 18 C.F.R. Section(s) 292.204(b)(1)-(2). Cow manure is "biomass" under Section(s) 201's definition of "primary energy source." 18 C.F.R. 292.202(a). Only if a facility produces electricity from something other than fossil fuel may it retain its favored status as a QF. 16 U.S.C. Section(s) 796(17)(C). The Section(s) 201 definition of "primary energy source," however, excludes-"under rules prescribed by the Commission"-"the minimum amounts of the fuel required to alleviate or prevent ... unanticipated equipment outages." 16 U.S.C. Section(s) 796(17)(B)(i)-(ii)(I). The Commission's rules promulgated in compliance with Section(s) 201 state: (1)(i) The primary energy source of the facility must be biomass, waste, renewable resources, geothermal resources, or any combination thereof, and 75 percent or more of the total energy input must be from these sources ...</p></div> <div class="numbered-paragraph"> <p> (2) Use of oil, natural gas, and coal by a facility may not, in the aggregate, exceed 25 percent of the total energy input of the ...</p> </div> </div> </div> <div id="caseToolTip" class="caseToolTip" style="display: none;"> <div class="toolTipHead"> </div> <div class="toolTipContent"> <p> Our website includes the first part of the main text of the court's opinion. To read the entire case, you must purchase the decision for download. With purchase, you also receive any available docket numbers, case citations or footnotes, dissents and concurrences that accompany the decision. Docket numbers and/or citations allow you to research a case further or to use a case in a legal proceeding. Footnotes (if any) include details of the court's decision. If the document contains a simple affirmation or denial without discussion, there may not be additional text. </p> </div> <div class="toolTipFoot"> </div> </div> <br /> <div class="buyNowContainer"> <div class="price"> <img src="/assets/img/findACase/bracket-left.png" alt="" /> <span>Buy This Entire Record For $7.95</span> <img src="/assets/img/findACase/pdf.png" class="pdf" alt="" /> <img src="/assets/img/findACase/bracket-right.png" alt="" /> </div> <div class="details"> <p> Download the entire decision to receive the complete text, official citation,<br /> docket number, dissents and concurrences, and footnotes for this case. </p> <p> <a class="showCaseToolTip">Learn more about what you receive with purchase of this case.</a> </p> </div> <div class="buttons"> <input type="submit" name="FAC$cphMainContent$btnBuyNowBottom" value="Buy Now" id="btnBuyNowBottom" class="btn-cart-buy-now btn btn-fac btnOrderTop" data-doc-short-name="19950616_0000149.cdc.htm" data-doc-title="<title> NEW CHARLESTON POWER I v. FEDERAL ENERGY REGULATORY COMMISSION" /> <input type="submit" name="FAC$cphMainContent$btnAddToCartBottom" value="Add To Cart" id="btnAddToCartBottom" class="btn-cart-add btn btn-fac btnOrderTop" data-doc-short-name="19950616_0000149.cdc.htm" data-doc-title="<title> NEW CHARLESTON POWER I v. FEDERAL ENERGY REGULATORY COMMISSION" /> </div> </div> <input type="hidden" name="FAC$cphMainContent$hfDocID" id="hfDocID" value="\FCT\CDC\1995\19950616_0000149.CDC.htm" /> <input type="hidden" name="FAC$cphMainContent$hfDocTitle" id="hfDocTitle" value="<title> NEW CHARLESTON POWER I v. FEDERAL ENERGY REGULATORY COMMISSION" /> <input type="hidden" name="FAC$cphMainContent$hfDocShortName" id="hfDocShortName" value="19950616_0000149.CDC.htm" /> </div> <div id="pnlGrayBarBottom" class="grayBar"> <span class="grayBarLeft"></span><span class="grayBarRight"></span> </div> <div id="footer"> <p> <a href="http://findacase.com/">Home</a> <span>/</span> <a href="http://findacase.com/our-sources.aspx"> Our Sources</a> <span>/</span> <a href="http://findacase.com/about.aspx">About Us</a> <span>/</span> <a href="http://findacase.com/faq.aspx">FAQs</a> <span>/</span> <a href="http://findacase.com/research/advanced-search.aspx">Advanced Search</a> </p> <p> copyright 2017 LRC, Inc. <a href="http://findacase.com/about.aspx">About Us</a> </p> <p> <span id="privacyPolicy"><a href="http://findacase.com/privacy-policy.aspx">PRIVACY POLICY</a></span> </p> <div id="crosslink" style="width: 100%; margin-left: auto; margin-right: auto; text-align: center;"><a href="http://www.legalresearch.com/litigation-advisor/litigation-pathfinder/litigation-pathfinder-subscription-plan/"><img src="http://findacase.com/Img/ad_FACtoLitPath.jpg" alt="Litigation Pathfinder - practical legal advice and comprehensive research resources made affordable" style="width: 375px;" /></a></div> </div> </div> </form> </body> </html>